What is PM Kusum Yojana?
PM Kusum (Pradhan Mantri Kisan Urja Suraksha evam Utthan Mahabhiyan) Yojana is the Indian government's flagship scheme to promote rooftop solar adoption. Under Component C of this scheme, residential homeowners can receive a central subsidy of up to ₹78,000 for a 3 kW rooftop solar system.
How Much Subsidy Can You Get?
| System Size | Central Subsidy | Your Cost After Subsidy |
|---|---|---|
| 1 kW | ₹30,000 | ~₹25,000 |
| 2 kW | ₹60,000 | ~₹30,000 |
| 3 kW | ₹78,000 | ~₹42,000 |
| 4–10 kW | ₹78,000 (capped) | ~₹80,000–₹2,20,000 |
Eligibility Criteria
- Must be a residential property owner (not tenant)
- Property must be in Tamil Nadu
- TANGEDCO connection required
- Only one subsidy per meter connection
- System must be installed by MNRE-empanelled vendor (Heliostrom is empanelled)
Documents Required
- 1Aadhaar card (homeowner)
- 2Electricity bill (last 3 months)
- 3Property ownership proof
- 4Bank account details for subsidy transfer
- 5Passport-size photograph
How Heliostrom Handles It For You
When you choose Heliostrom, we handle the entire PM Kusum application process — from TANGEDCO feasibility study to subsidy registration on the National Portal for Rooftop Solar. Most customers receive their subsidy within 30–45 days of installation.
Pro Tip: Heliostrom has processed 80+ PM Kusum applications with a 100% approval rate. We handle all paperwork — you just sign and wait for the bank transfer.
Step-by-Step: How to Apply Through Heliostrom
- 1Contact Heliostrom for a free site survey
- 2We assess your roof and recommend the right system size
- 3We submit the TANGEDCO feasibility application on your behalf
- 4Upon approval, we install the system (2–3 days)
- 5We register your installation on the National Portal
- 6Subsidy is credited to your bank account within 30–45 days
Common Questions
Can I claim subsidy for a system above 3 kW?
Yes, but the subsidy is capped at ₹78,000 regardless of system size above 3 kW. For larger systems, the subsidy still applies but covers a smaller percentage of the total cost.
How long does the subsidy take to arrive?
Typically 30–45 days after installation registration on the National Portal. Heliostrom tracks your application and follows up with authorities to ensure timely disbursement.
