Commercial

50 kW Industrial Solar: How Ambattur Factory Cut EB Bills by 70%

A real case study from our Ambattur installation. How a 50 kW rooftop system reduced a garment factory's monthly EB bill from ₹60,000 to ₹18,000.

February 12, 20266 min readHeliostrom Team
Share:WhatsApp
50 kW Industrial Solar: How Ambattur Factory Cut EB Bills by 70%

The Ambattur Factory: Before Solar

Karthik Murugan runs a mid-sized garment manufacturing unit in Ambattur Industrial Estate, Chennai. Before solar, his factory's monthly EB bill consistently exceeded ₹60,000 — one of his biggest operating expenses after labour.

The System Design

SpecificationDetails
System Size50 kW On-Grid
Panel BrandWaaree 540W (93 panels)
InverterSungrow 50kW String Inverter
Roof Area Used~3,200 sq ft
Installation Time12 days
TANGEDCO ApprovalNet metering, 1 MW limit

Results After 10 Months

  • Monthly EB bill reduced from ₹60,000 to ₹18,000 (70% reduction)
  • Annual savings: ₹5,04,000
  • System cost after accelerated depreciation benefit: ₹9,80,000
  • Projected payback: 1.9 years
  • 25-year projected savings: ₹1.26 crore

Commercial and industrial solar installations qualify for 40% accelerated depreciation in Year 1, dramatically reducing the effective cost.

What Karthik Says

"Heliostrom completed the installation in under 2 weeks without disrupting our production schedule. The TANGEDCO approval was handled completely by their team. My EB bill dropped by 70% from the first month. ROI will happen in under 2 years." — Karthik Murugan, Ambattur

Ready to Go Solar?

Get a free site survey from Heliostrom.

Our engineers will visit your property, assess your roof, and calculate your exact savings — completely free and with no obligation.